Data Centre Construction Project Manager
CoreWeave Europe · London, England / Falun, Sweden / Barcelona, Spain / Ovrebo, Norway
Posted 22 days ago
or apply directly on CoreWeave Europe's site. We never take the application ourselves.
Is this posting real?
- This role has been open
- 22 days CoreWeave Europe's roles stay open a median of 45 days
- Reposted
- No
- Salary listed
- No 0% of CoreWeave Europe's roles list one
- Ghost-job risk at CoreWeave Europe
- high 53 stale, 2 reposted of 77 open
- Hiring momentum
- 91 roles opened in the last 90 days ↑ up vs. the prior 90 days
- Last confirmed on the employer's board
- 2026-09-17
Measured from postings appearing on and disappearing from CoreWeave Europe's own greenhouse board since 2026-08-03. Full hiring picture for CoreWeave Europe.
About this role
As a Data Center Construction Project Manager at CoreWeave, you will lead the construction of data centers, managing projects from pre-construction to turnover. Your responsibilities will include overseeing contracts, ensuring compliance with specifications, and supervising the installation of complex Mechanical, Electrical, and Plumbing (MEP) systems. You will also manage project schedules and budgets while collaborating with various stakeholders to ensure successful project completion.
- benefits
- 4/5
- freshness
- 4/5
- career value
- 4/5
- role clarity
- 5/5
- pay transparency
- 0/5
Scored from the posting itself — how clearly the role is described, how much it says about pay and benefits, and how recently it was listed. Not a judgement of CoreWeave Europe as an employer.
What you need
- 3+ years of construction project management experience with direct leadership on data centre construction projects
- Strong technical expertise in mission-critical infrastructure, with an emphasis on MEP systems, power distribution, cooling, and redundancy protocols
- Demonstrated experience managing construction contracts, financial forecasting, budget development, change management, and cost estimation
- Proven track record of on-site project leadership, coordinating general contractors, subcontractors, statutory bodies, and vendors
- Strong knowledge of pre-construction services, risk management, scheduling tools, and web-based project management software
- Ability to work on-site full-time and possess a valid driver's licence
Nice to have
- Bachelor’s degree in Construction Management, Architecture, Engineering, or a related technical discipline
- Experience managing large-scale mission-critical infrastructure projects with contract values exceeding £80M ($100M+)
- Recognized industry certifications, such as Project Management Professional (PMP) or LEED certification
What you get
- Family-level Medical Insurance
- Family-level Dental Insurance
- Generous Pension Contribution
- Life Assurance at 4x Salary
- Critical Illness Cover
- Employee Assistance Programme
Worth weighing
- No specific salary range mentioned
- Role requires full-time on-site presence
- Requires a valid driver's license
- Experience with large-scale projects preferred but not mandatory
Summarised from CoreWeave Europe's posting. Read the full original.
Listed by CoreWeave Europe on their greenhouse job board, last confirmed open on 2026-09-17. PitchMeAI is not the employer.
More roles at CoreWeave Europe
- Senior Engineer, AI Object StorageWarsaw, Poland
- Senior Counsel, EmploymentLondon, England
- Manager, Technical Solutions ManagementLondon, UK
- Fleet Engineering Project Manager, Data CenterWarsaw, Poland
- Senior Payroll Specialist– International (EMEA & APAC)London, England
- Hardware Engineer, GPU InfrastructureWarsaw, Poland
- Hardware Engineer, Server InfrastructureWarsaw, Poland
- Staff Product Manager - Physical AI/RoboticsLondon, England